The answer is no, off grid solar power plant require batteries to store electricity. If the grid power isn't available and batteries are out of equation too.
[pdf] First, turn on the battery switch, second turn on the battery switch of the single phase inverter, third turn on the solar panel switch, fourth, turn on the output, and finally turn on the load;
[pdf] 4 Steps to Properly Ground Your Solar InverterStep 1: Run a Properly Sized Grounding Electrode Conductor The grounding conductor between the inverter and the grounding electrode system should be #6 AWG or larger bare copper wire. . Step 2: Connect to Grounding Electrodes . Step 3: Establish Continuity . Step 4: Label All Connections .
[pdf] Maximum power point tracking (MPPT), or sometimes just power point tracking (PPT), is a technique used with variable power sources to maximize energy extraction as conditions vary. The technique is most commonly used with (PV) solar systems but can also be used with , and . The minimum input voltage should be at least 5 volts over your battery voltage OR the minimum specified in the manual. If the voltage is not high enough, the charge controller will not start.
[pdf] Step-by-Step Methods to Size Solar InverterStep 1: Determine the Total Power Rating of the PV Array . Step 2: The Various Solar Inverter Sizing Ratios . Step 3: Match the Inverter Voltage to the Solar Array . Step 4: Determine the Right Number of Strings Per Inverter . Step 5: Select Among String, Microinverter, or Power Optimizers .
[pdf] These numbers are your inverter's maximum input voltage and your PV array voltage. Your PV array voltage is the total voltage of all of your modules when connected in a series.
[pdf]