The answer is no, off grid solar power plant require batteries to store electricity. If the grid power isn't available and batteries are out of equation too.
[pdf] 4 Steps to Properly Ground Your Solar InverterStep 1: Run a Properly Sized Grounding Electrode Conductor The grounding conductor between the inverter and the grounding electrode system should be #6 AWG or larger bare copper wire. . Step 2: Connect to Grounding Electrodes . Step 3: Establish Continuity . Step 4: Label All Connections .
[pdf] Maximum power point tracking (MPPT), or sometimes just power point tracking (PPT), is a technique used with variable power sources to maximize energy extraction as conditions vary. The technique is most commonly used with (PV) solar systems but can also be used with , and . The minimum input voltage should be at least 5 volts over your battery voltage OR the minimum specified in the manual. If the voltage is not high enough, the charge controller will not start.
[pdf] MPPT optimizes the voltage at which panels operate, ensuring that even under less than perfect conditions (cloudy skies, dusk, or dawn), the system performance remains at peak.
[pdf] You'll generally need an inverter that's 75% as big as your solar panel system's kilowatt-peak (kWp), which is how much solar energy it produces at standard test conditions.
[pdf] The CESS-HY series is a three-phase energy storage inverter custom-developed for commercial and industrial projects. It offers various power levels of 25/30/36/40/50kW, providing higher power output to ensure stable energy for loads.
[pdf]