As per the notification, projects with a capacity of above 1 kW and up to 10 kW, the benchmark cost has been set at Rs 54/W, or Rs 54,000 per kW.
[pdf] The first were installed in 2009, and are not associated with storage. The installed capacity is 13 MW, in particular via the Longoni power plant, inaugurated in 2010. Solar energy is the only renewable energy with significant development potential on the island; the wind potential (22 MW according to a study) would not lead to a significant production because the wind blows only 6 months per year.
[pdf]