As per the notification, projects with a capacity of above 1 kW and up to 10 kW, the benchmark cost has been set at Rs 54/W, or Rs 54,000 per kW.
[pdf] DO NOT use any polish, but use a specific polish designed for plastics such as the Novus range or Plexus or 3M. Generally hand polishing is recommended.
[pdf] With the new round of power system reform, energy storage, as a part of power system frequency regulation and peaking, is an indispensable part of the reform. Among them, user-side small energy storage device.
[pdf]